Bridging the gap

All posts regarding baseboard construction
Richard
Posts: 65
Joined: Mon Nov 05, 2018 3:14 pm
Location: Chichester
Contact:

Bridging the gap

#1

Post by Richard »

My rebuilding of my layout with additional baseboards has reached the door. I’m at a bit of a loss as to how to connect the two ends. It’s made more complicated by the door being inward opening against the adjacent wall.One way would be to remove the door completely and build a lifting or lift out section (like many of us my days of comfortably ducking under are over). On the other hand, keeping the door means building something L shaped to meet the 2ft wide baseboard at one angle and the 1ft wide at the other. I hope the pictures explain. Thoughts welcome as are appropriately ate web pages and YouTube vpreferences.
Image

Image
glencairn
Posts: 1573
Joined: Sun Jan 06, 2019 10:30 am
Location: Both sides of the Border
Contact:

Re: Bridging the gap

#2

Post by glencairn »

Hi Richard. I had the same challenge a couple of years back. I made a lift out bridge by screwing two support pieces to each sides and a small plank fits across.
IMG_0687.JPG
Metcalfe bridge sides etc. added to make it look like a bridge. It does lift off, but not often. :lol:

Glencairn
To the world you are someone. To someone you are the world
I Cannot Afford the Luxury of a Negative Thought.
User avatar
Steve M
Posts: 3474
Joined: Thu Oct 04, 2018 5:29 pm
Location: Rochester, Kent
Contact:

Re: Bridging the gap

#3

Post by Steve M »

Richard, a common problem with a number of solutions but made more complex by the corner location. I have the same issue in my shed.
First step, imho, is to establish what the trackplan is over the gap, ie one or multiple tracks and exactly where they will run. In practice they will form an arc so a curved board may be better than an L shape which would be bigger and heavier as a result.
Perhaps answer the track layout question first and then we can make some more suggestions. A trackplan would help.
Also consider whether you want it with scenery or not (something that I have included in the past).
"Not very stable, but incredibly versatile." ;)
User avatar
Mr Bones
Posts: 693
Joined: Sun Oct 14, 2018 9:24 pm
Location: Canterbury Area
Contact:

Re: Bridging the gap

#4

Post by Mr Bones »

I was going suggest that rather than remove the door a stable door might be an option. However, looking at your photo I think even the lower half of that would be to high.
And the Lord said unto John “Come forth and receive eternal life”, but John came fifth and won a toaster!
User avatar
Walkingthedog
Posts: 4985
Joined: Thu Oct 04, 2018 5:51 pm
Location: HAZLEMERE, BUCKS.
Contact:

Re: Bridging the gap

#5

Post by Walkingthedog »

Change the door to open outwards.
Nurse, the screens!
Richard
Posts: 65
Joined: Mon Nov 05, 2018 3:14 pm
Location: Chichester
Contact:

Re: Bridging the gap

#6

Post by Richard »

There isn’t really a track plan. The right hand board will contain a double ended ladder fiddle yard. No scenery. The other board is a townscape scenic section which will have a single track running parallel to the back of the board
Image
The connecting line to be supported across the gap will be more or less a curve. There will not be any scenery or landscaping here either. Hopefully the picture helps.
footplate1947
Posts: 758
Joined: Fri Oct 19, 2018 8:32 am
Location: Norham, Northumberland
Contact:

Re: Bridging the gap

#7

Post by footplate1947 »

Why cant you just have lift up flap the size of the corner. It will be larger than a normal lifting flap but the same as normal except the exit for the track will be on the side of the flap instead of the end which is more usual. The large flap will be suported by framework fitted to the wall next to it, and the end of the other base board. The base boards will be held steady by fixing them to the walls keeping everything nice and solid.
But I think the other idea of making the door open outwards is the easiest of the two options. I would have done that to mine but for the fact it was next to the kitchen door and I thought an accident could happen involving something hot being carried out of the kitchen. God forbid,,, Not only that, my new carpets getting covered in gravy
Last edited by footplate1947 on Fri Apr 12, 2019 10:00 am, edited 1 time in total.
If only there was enough hours in the day..................John
User avatar
Steve M
Posts: 3474
Joined: Thu Oct 04, 2018 5:29 pm
Location: Rochester, Kent
Contact:

Re: Bridging the gap

#8

Post by Steve M »

The biggest issue - and this was the subject of much debate on another thread - is that of safety.
With the door in the current position and the hinged baseboard in the down position, the door cannot be opened from outside. Should the occupant of the room suffer an accident or illness this could, in the extreme, be life threatening.

Re-hanging the door would solve that problem but there may be another way.

If the tracks leading across the gap could be arranged at the front of the two existing boards, it may be possible to have the 'bridge' on a diagonal that still allows the door to open. A crude sketch below may help to explain.

Image
"Not very stable, but incredibly versatile." ;)
Richard
Posts: 65
Joined: Mon Nov 05, 2018 3:14 pm
Location: Chichester
Contact:

Re: Bridging the gap

#9

Post by Richard »

Thanks for your help. It’s given me lots to think about and a plan is forming. I’ll be doing a mock-up over the next few days and I’ll post some pictures here to show my solution.
footplate1947
Posts: 758
Joined: Fri Oct 19, 2018 8:32 am
Location: Norham, Northumberland
Contact:

Re: Bridging the gap

#10

Post by footplate1947 »

Quite right Steve ........To be honest I had not even thought about that point. So, the door opening outwards is the way to do it or the room could be a death trap.
If only there was enough hours in the day..................John
Post Reply

Who is online

Users browsing this forum: No registered users and 0 guests