my layout

Dedicated area to show the community your model railway projects.
Post Reply
Paul Palmer
Posts: 87
Joined: Sun Oct 07, 2018 12:46 pm
Location: Devon
Contact:

my layout

#1

Post by Paul Palmer »

Finally,my Hornby GWR coaches arrived today
Paul Palmer
Posts: 87
Joined: Sun Oct 07, 2018 12:46 pm
Location: Devon
Contact:

Re: my layout

#2

Post by Paul Palmer »

3 more still on pre order
Chris
Posts: 133
Joined: Thu Oct 18, 2018 6:24 pm
Contact:

Re: my layout

#3

Post by Chris »

Very nice, Hornby do like their long lead times
brian1951
Posts: 1273
Joined: Thu Oct 04, 2018 5:52 pm
Contact:

Re: my layout

#4

Post by brian1951 »

Not all of us.
Paul Palmer
Posts: 87
Joined: Sun Oct 07, 2018 12:46 pm
Location: Devon
Contact:

Re: my layout

#5

Post by Paul Palmer »

The boxes have that new car smell,ahh,as with everbody else on the forum,i am starting again,so I will be posting some pictures of my layout over the weekend
User avatar
yelrow
Posts: 954
Joined: Thu Oct 04, 2018 6:54 pm
Location: Burgundy, France
Contact:

Re: my layout

#6

Post by yelrow »

Boxes start to be a real pain. I have some 200, and take some storing. Would not be so bad if standaed sizes, but with o gauge, oo, tt and n, not to mention sets, and larger loco boxes, it is a bit of a pain
User avatar
Chops
Posts: 1098
Joined: Sat Oct 06, 2018 8:11 am
Location: El Paso, Texas USA
Contact:

Re: my layout

#7

Post by Chops »

It will be a pleasure to see this layout. US layouts generally have passenger service as a secondary theme, in Britain it is a primary theme.
User avatar
Walkingthedog
Posts: 4972
Joined: Thu Oct 04, 2018 5:51 pm
Location: HAZLEMERE, BUCKS.
Contact:

Re: my layout

#8

Post by Walkingthedog »

That is usually the case Chops, but I don’t have a station and only own five coaches that rarely see the light of day.
Nurse, the screens!
Paul Palmer
Posts: 87
Joined: Sun Oct 07, 2018 12:46 pm
Location: Devon
Contact:

Re: my layout

#9

Post by Paul Palmer »

The coaches came with the option of different couplers and buffers,would I be right in thinking,no buffers if run in a hst rake?
Mountain Goat
Posts: 1537
Joined: Fri Oct 05, 2018 12:57 pm
Contact:

Re: my layout

#10

Post by Mountain Goat »

With Mk 3's which were mostly used with HST's the coaches used with HST's dont have buffers and the ones used to tow behind a seperate locomotive do have buffers.
I have to say that though I've seen HST's up close on many occasions in my line of work in the past, I've not actually visually noticed!
It is just that I remember the difference from buying the old Hornby coaches and the instructions with them.
I have worked Mk2's and helped with Mk1's and these have retractablw buffers. When a coach is coupled to another coach the buffers are pushed in and the buckeye coupling is raised. Where the coaches need to be coupled to a loco the buckeye is dropped and collars are placed over the buffers to keep them in the extended position. The screw link coupling is then used. This is tightened up and then slackened off three or four turns (If I remember correctly) so that the coaches would negotiate curves. It was all part of my duties as a train conductor. Changing the points and coupling up and uncoupling. We were only allowed to work them if we could lift the buckeyes on our own and we were not allowed the assistance of a buckeye tool. (We never were given those tools).
One of the most dangerous jobs I had was when working was to make sure the driver had turned the ETH off before I went under to uncouple the coach, as it was really a test of faith as it was only by word of mouth one had to know it had been turned off.
Last edited by Mountain Goat on Sat Oct 20, 2018 12:22 pm, edited 2 times in total.
Budget modelling in 0-16.5...
Post Reply

Who is online

Users browsing this forum: No registered users and 0 guests