Hi all,
I have a lot of old Hornby nickel silver track and points with motors attached. If this stuff no longer viable and should I just dump it.

Brian
User avatar
Steve M
Posts: 3461
Joined: Thu Oct 04, 2018 5:29 pm
Location: Rochester, Kent
Contact:

Re: old track

#2

Post by Steve M »

It all depends on condition. Certainly, if it were steel then the bin would be the best option.
"Not very stable, but incredibly versatile." ;)
Chilternturbo
Posts: 2
Joined: Sun Aug 04, 2019 10:27 am
Contact:

Re: old track

#3

Post by Chilternturbo »

Thanks Steve, it's the track that is painted silver so it does look like a trip to the dump.
Brian
User avatar
Walkingthedog
Posts: 4973
Joined: Thu Oct 04, 2018 5:51 pm
Location: HAZLEMERE, BUCKS.
Contact:

Re: old track

#4

Post by Walkingthedog »

If it is nickel silver it will be non magnetic.
Nurse, the screens!
Mountain Goat
Posts: 1537
Joined: Fri Oct 05, 2018 12:57 pm
Contact:

Re: old track

#5

Post by Mountain Goat »

Never dump old track as it has so many uses.
This little waggons frame was made using rail from old 00 gauge track...
These point levers were also made from old 00 gauge rails...
Plenty of uses...
Budget modelling in 0-16.5...
User avatar
RSR Engineer
Posts: 256
Joined: Sun Oct 07, 2018 11:18 pm
Location: Freistaat Bayern
Contact:

Re: old track

#6

Post by RSR Engineer »

I agree with Mountain Goat. Even if there's no immediately apparent application for old track, don't just throw it away. Stick it in a box and stash it on the shelf somewhere, coz no sooner have you parted with it, you'll wish you hadn't.

Neat lever frame, MG. Are all your points (and, I suppose, signals) operated in this way?

Cheers,
Artur
Mountain Goat
Posts: 1537
Joined: Fri Oct 05, 2018 12:57 pm
Contact:

Re: old track

#7

Post by Mountain Goat »

They will be if all goes to plan. I will need to make a few more levers and some signals.
Budget modelling in 0-16.5...
User avatar
RSR Engineer
Posts: 256
Joined: Sun Oct 07, 2018 11:18 pm
Location: Freistaat Bayern
Contact:

Re: old track

#8

Post by RSR Engineer »

Such a task would be a bit daunting on my layout, MG. Have you made jigs etc to aid mass-production?

Cheers.
Artur
Mountain Goat
Posts: 1537
Joined: Fri Oct 05, 2018 12:57 pm
Contact:

Re: old track

#9

Post by Mountain Goat »

Not really. I maybe able to post some pictures of how I made the point levers... I have them on my other tablet.
Budget modelling in 0-16.5...
Post Reply

Who is online

Users browsing this forum: No registered users and 1 guest