South Auckland Junction

Dedicated area to show the community your model railway projects.
User avatar
JohnSmithUK
Posts: 185
Joined: Fri Oct 05, 2018 12:12 pm
Location: South Shields
Contact:

Re: South Auckland Junction

#81

Post by JohnSmithUK »

Something must be wrong, two updates in three days.

Openings have been cut for two and a half loading bays on one side of the warehouse, and a staff entrance on the other.

Tightened up a point that wasn't too happy.

Did a dry fit in situ, doesn't look to bad. There will be a second angled section to finish the roof.

Next steps are to finesse the cut openings, and tidy the cuts up. After that, construction begins.

Pictures at the bottom as always.
User avatar
JohnSmithUK
Posts: 185
Joined: Fri Oct 05, 2018 12:12 pm
Location: South Shields
Contact:

Re: South Auckland Junction

#82

Post by JohnSmithUK »

BREAKING NEWS......BREAKING NEWS

Construction has started.
User avatar
JohnSmithUK
Posts: 185
Joined: Fri Oct 05, 2018 12:12 pm
Location: South Shields
Contact:

Re: South Auckland Junction

#83

Post by JohnSmithUK »

Second side, bracing pieces and pieces to help place the angles roof now in place.

I'll put the roof on tomorrow, and a central roof support.
User avatar
JohnSmithUK
Posts: 185
Joined: Fri Oct 05, 2018 12:12 pm
Location: South Shields
Contact:

Re: South Auckland Junction

#84

Post by JohnSmithUK »

Progress in situ.
User avatar
RogerB
Posts: 1384
Joined: Thu Oct 04, 2018 9:17 pm
Location: Dorset
Contact:

Re: South Auckland Junction

#85

Post by RogerB »

Starting to come together very nicely - well done. R-
Young at heart. Slightly older in other parts.
User avatar
JohnSmithUK
Posts: 185
Joined: Fri Oct 05, 2018 12:12 pm
Location: South Shields
Contact:

Re: South Auckland Junction

#86

Post by JohnSmithUK »

RogerB wrote: Sat Sep 28, 2019 7:20 pm Starting to come together very nicely - well done. R-
Thank you. Taking it steady, as my first ever attempt using plasticard.
User avatar
JohnSmithUK
Posts: 185
Joined: Fri Oct 05, 2018 12:12 pm
Location: South Shields
Contact:

Re: South Auckland Junction

#87

Post by JohnSmithUK »

I've been having some dangerous thoughts.

I have some usb powered led strip lights somewhere in my cupboard of mystery, it shouldn't be too hard to make a shroud to floodlight the side of my warehouse.......

This may not end well.
User avatar
JohnSmithUK
Posts: 185
Joined: Fri Oct 05, 2018 12:12 pm
Location: South Shields
Contact:

Re: South Auckland Junction

#88

Post by JohnSmithUK »

More progress. We have a roof.

The main structure is now complete. Next steps are to add cappings of some description to the roof joins, fill and sand back the joins of the 40 thousandth pieces, then prime it.

Then sign making, door making, lighting, other detailing and anything else that occurs to me.

The primer grey is a decent match to buildings near here, so will put a few coats on, and the main colour is done. Possibly do some lines in a highlighting colour to break up the sea of grey.

Pictures as always are below.
User avatar
JohnSmithUK
Posts: 185
Joined: Fri Oct 05, 2018 12:12 pm
Location: South Shields
Contact:

Re: South Auckland Junction

#89

Post by JohnSmithUK »

Is it wrong for 'playing trains', to end up progessing something?

Started with having some shunting practice, and decided to see if a non runner 08 I recently acquired could be salvaged. Hence picture one.

After a bit of a strip down, the pick up, on just the centre axle only was a mess. Cleaned, and sort of runs now. The other 08 I have of a similar vintage has pickups on the front and back axles. Some modifications may be required.

Anyway, it runs, but sometimes needs a little push to get going. Soooooo....... pictures two and three. It maybe a sledgehammer to crack a peanut time.
User avatar
JohnSmithUK
Posts: 185
Joined: Fri Oct 05, 2018 12:12 pm
Location: South Shields
Contact:

Re: South Auckland Junction

#90

Post by JohnSmithUK »

Practice has started on the filling and sanding using milliputt. Waiting on it to go off on a practice piece, then will sand back and paint it to see how it goes.

If everything goes well, then it will be reproduced on the main building.

A few pictures because I can.
Post Reply

Who is online

Users browsing this forum: No registered users and 1 guest