Layout

For those modelling in TT, TT120 and 3mm scales.
Post Reply
User avatar
RogerB
Posts: 1383
Joined: Thu Oct 04, 2018 9:17 pm
Location: Dorset
Contact:

Layout

#1

Post by RogerB »

Here is the layout I have in mind. Gentle critique always welcome. The track is built in SCARM using the Tilling TT-M library so possibly not completely accurate. I will await the Hornby TT:120 library to be uploaded to SCARM and do it again. All on a 7' x 3' board with R4 and R3 track on the left and R2 inside all that on the right. Not sure what happened on the right with the R2 track and the distance between the neighbours, but all will be resolved on the day. Room available regrettably prevents long sweeping curves. Top left rectangle is the signal box, top right the goods shed and the station is at the bottom. Rule 1 applies. R-

Image
Young at heart. Slightly older in other parts.
User avatar
Walkingthedog
Posts: 4972
Joined: Thu Oct 04, 2018 5:51 pm
Location: HAZLEMERE, BUCKS.
Contact:

Re: Layout

#2

Post by Walkingthedog »

On the right I think the R3 track is too close to the R4 not the R2 is too far from the R3.
I think the layout looks fine.
Nurse, the screens!
User avatar
RogerB
Posts: 1383
Joined: Thu Oct 04, 2018 9:17 pm
Location: Dorset
Contact:

Re: Layout

#3

Post by RogerB »

Yup,, that is why I said,

Not sure what happened on the right with the R2 track and the distance between the neighbours, but all will be resolved on the day.

No matter what I did one or the other was always "out" a tad.

R-
Young at heart. Slightly older in other parts.
User avatar
Walkingthedog
Posts: 4972
Joined: Thu Oct 04, 2018 5:51 pm
Location: HAZLEMERE, BUCKS.
Contact:

Re: Layout

#4

Post by Walkingthedog »

So you did, I misread it.

I reckon the layout is good, you can get to and from the different circuits from any direction.
Nurse, the screens!
User avatar
yelrow
Posts: 954
Joined: Thu Oct 04, 2018 6:54 pm
Location: Burgundy, France
Contact:

Re: Layout

#5

Post by yelrow »

lot of points Rog, how do you intend to operate them.
User avatar
Steve M
Posts: 3461
Joined: Thu Oct 04, 2018 5:29 pm
Location: Rochester, Kent
Contact:

Re: Layout

#6

Post by Steve M »

It will be interesting to see it all come together Roger. Shame the board can’t be a bit longer but appreciate your space constraints.
"Not very stable, but incredibly versatile." ;)
User avatar
RogerB
Posts: 1383
Joined: Thu Oct 04, 2018 9:17 pm
Location: Dorset
Contact:

Re: Layout

#7

Post by RogerB »

yelrow wrote: Tue Nov 15, 2022 11:54 am lot of points Rog, how do you intend to operate them.
They'll be servo operated John. R-
Young at heart. Slightly older in other parts.
Jsa274
Posts: 28
Joined: Thu Mar 05, 2020 5:25 pm
Contact:

Re: Layout

#8

Post by Jsa274 »

Fifteen sets of points, nearly eclipses my layout’s sixteen motors - I’m sure others on here will have more than that!

Layout plan looks great with plenty of operational possibilities, the stubby siding off the inner loop platform opens up opportunities for traction swaps en route.
User avatar
Walkingthedog
Posts: 4972
Joined: Thu Oct 04, 2018 5:51 pm
Location: HAZLEMERE, BUCKS.
Contact:

Re: Layout

#9

Post by Walkingthedog »

I had over 30 on my OO layout.
Nurse, the screens!
User avatar
RogerB
Posts: 1383
Joined: Thu Oct 04, 2018 9:17 pm
Location: Dorset
Contact:

Re: Layout

#10

Post by RogerB »

Yes, I have packed them in a bit. Luckily, like most point motor controllers, it is possible to operate two servos fron one port. R-
Young at heart. Slightly older in other parts.
Post Reply

Who is online

Users browsing this forum: No registered users and 1 guest