Resurrection of the Potts Line.
Re: Resurrection of the Potts Line.
Two 50ft loops on the layout have now been dedicated for BL running.
Re: Resurrection of the Potts Line.
Back to layout building today, the tedious job of cutting the groove for the Faller car guide wire all 40ft of it.
Re: Resurrection of the Potts Line.
After months of quietly working away the faller road build is nearing the end, over 40ft of roadway, 8 sets of traffic lights, 2 bus stops, plus a distance control system all with timed stops, lost count of how many yards of wiring and control modules used, all thanks to lockdown.
- Walkingthedog
- Posts: 4978
- Joined: Thu Oct 04, 2018 5:51 pm
- Location: HAZLEMERE, BUCKS.
- Contact:
Re: Resurrection of the Potts Line.
Well done Brian. You can switch it on, let it get on with it and have a nap.
Nurse, the screens!
- bulleidboy
- Posts: 2317
- Joined: Thu Oct 04, 2018 6:30 pm
- Location: Basingstoke, Hants
- Contact:
- RSR Engineer
- Posts: 256
- Joined: Sun Oct 07, 2018 11:18 pm
- Location: Freistaat Bayern
- Contact:
Re: Resurrection of the Potts Line.
Yes, movement on the roads as well as on the rails is marvelous to watch. I wish you much job satisfaction, Brian. Can't wait to see it.
Cheers,
Artur
Cheers,
Artur
Re: Resurrection of the Potts Line.
Faller fairground is now up and running too, 2 ferris wheels 1 chairplane 1 merry go round and a set of swing boats, 5 motors and loads of LEDs plus miles of wire.
Who is online
Users browsing this forum: No registered users and 1 guest