Page 20 of 21
Re: Resurrection of the Potts Line.
Posted: Tue Jul 28, 2020 11:36 am
by brian1951
A pair of BLs ready for work.
Re: Resurrection of the Potts Line.
Posted: Tue Jul 28, 2020 2:54 pm
by brian1951
Two 50ft loops on the layout have now been dedicated for BL running.
Re: Resurrection of the Potts Line.
Posted: Thu Aug 06, 2020 4:14 pm
by Chops
Smashing set of streamliners.
Re: Resurrection of the Potts Line.
Posted: Sun Aug 09, 2020 12:19 pm
by brian1951
Back to layout building today, the tedious job of cutting the groove for the Faller car guide wire all 40ft of it.
Re: Resurrection of the Potts Line.
Posted: Sat Jan 09, 2021 3:40 pm
by brian1951
After months of quietly working away the faller road build is nearing the end, over 40ft of roadway, 8 sets of traffic lights, 2 bus stops, plus a distance control system all with timed stops, lost count of how many yards of wiring and control modules used, all thanks to lockdown.
Re: Resurrection of the Potts Line.
Posted: Sat Jan 09, 2021 3:41 pm
by Walkingthedog
Well done Brian. You can switch it on, let it get on with it and have a nap.
Re: Resurrection of the Potts Line.
Posted: Sat Jan 09, 2021 5:13 pm
by bulleidboy
Can't wait to see it Brian.
Re: Resurrection of the Potts Line.
Posted: Sat Jan 09, 2021 11:27 pm
by RSR Engineer
Yes, movement on the roads as well as on the rails is marvelous to watch. I wish you much job satisfaction, Brian. Can't wait to see it.
Cheers,
Artur
Re: Resurrection of the Potts Line.
Posted: Mon Jan 11, 2021 5:35 am
by Chops
Please do post.
Re: Resurrection of the Potts Line.
Posted: Thu Jan 14, 2021 2:39 pm
by brian1951
Faller fairground is now up and running too, 2 ferris wheels 1 chairplane 1 merry go round and a set of swing boats, 5 motors and loads of LEDs plus miles of wire.