Re: New build
Posted: Mon Aug 10, 2020 7:31 pm
On the left you have curve point point, but on the right you have curve point curve point so there is less track on the left hence the extra bit added after the second point.
For all model railways and railway modellers
https://www.modelrailwayforum.com/
Thanks for the adviceBandit Mick wrote: ↑Fri Aug 07, 2020 7:33 pm Ted re: wire in tube. Lots of similar materials can be used but I get my wires and corresponding tubes from a model aircraft suppliers - the sort used in radio controlled aircraft. Cos I like to make life difficult and to avoid wires/rods near wiring I cut/ file a groove at baseboard level then sit the tube with its pre-cut wire/rod into the groove. With a bit of jiggery pokery, I manage to locate the 90 turned up end of the wire into the point tie. At times, a little swearing helps things along.