Page 51 of 169

Re: WEST ORTON

Posted: Fri Dec 17, 2021 1:44 pm
by Steve M
Backscene fitted this week and then two signal boxes are finished - time for a trip round the layout.
Click the thumbnail to play.

Image20211217_132029 by Steve Mumford, on Flickr

Re: WEST ORTON

Posted: Fri Dec 17, 2021 1:51 pm
by Walkingthedog
Looks great Steve and the loco runs beautifully.

Re: WEST ORTON

Posted: Fri Dec 17, 2021 2:40 pm
by RogerB
First rate Steve, both videos. R-

Re: WEST ORTON

Posted: Fri Dec 17, 2021 3:39 pm
by bulleidboy
That's great Steve - I love the "chime" whistle - you now need a rake of weathered Gresley teaks to complete the picture.

Re: WEST ORTON

Posted: Fri Dec 17, 2021 6:41 pm
by Hound Dog
Great videos Steve - thought the second one with the loco going across the bridge was very life like ...... you did a fine job blending in all the various aspects of the scenery, which all come together really well.

Cheers - Richard

Re: WEST ORTON

Posted: Fri Dec 17, 2021 8:38 pm
by glencairn
Impressive looking locomotive in lovely scenery.

Glencairn

Re: WEST ORTON

Posted: Sat Dec 18, 2021 12:55 pm
by Steve M
I mentioned it the other day, but the length of the W1 shows up any unevenness in the rails and in one particular spot where I had obviously been too greedy with starting the slight incline leading to the viaduct, there was a distinct slowing and slipping.

Two hours later the two stretches of double track have been lifted, new track laid (no dip), tested, painted and ballasted. It’s going to take ages to dry at this time of year so I may put the heater on overnight to allow me to weather the new sections.......again.

Image2021-12-18_12-54-17 by Steve Mumford, on Flickr

There is a small irony that I sent the loco down the branch line by accident - that goes up and down like a scenic railway (I was going to use a more colourful phrase) and the loco sailed through as if it was on a billiard table!

The memsahib is out with our daughter all day tomorrow so I may be able to spend some (uninterrupted) time adjusting the joints over the lift out section.

What is really frustrating with the board joints is that they were perfectly aligned, tested, then tested again before ballasting, then tested again - I suspect a combination of cold and damp weather is having an effect.

I had made the layout semi-portable, really so that I could lift a board to work on the underside. In reality, once the wiring was completed, I haven’t yet, needed to move a board so I am resigned to replacing two or three inches of track at each joint if and when they play up.

Re: WEST ORTON

Posted: Sat Dec 18, 2021 1:02 pm
by Walkingthedog
Steve I love the way get on with things. I work the same way but often wish I took my time. I think of something to do on the layout to keep me occupied for a few days and 2 hours later it’s completed.

Re: WEST ORTON

Posted: Sat Dec 18, 2021 1:45 pm
by sandy
Love the signal box Steve. You probably have done it already but paint the insid of walls black to stop light comming through the walls as well as the windows.

Re: WEST ORTON

Posted: Sat Dec 18, 2021 1:55 pm
by Steve M
Deleted- duplicate post