00 Gauge short shunting/through layout
Posted: Sun Mar 03, 2019 8:19 pm
Hello all and welcome to a proposed layout I am planning.
as the topic says it will be 00 gauge and for shunting, but also allow for running stuff through, I am planning on having fiddle yards at both ends with a scenic section in the middle which is approximately 54 inches by 16 (maybe 17 cant stretch to 18 sadly) inches.
Here is a rough idea of what I am talking about
I am thinking that single car units like 128 and 121 can pass through, and maybe even get a coach or two shunted past just operational interest, other than that just an 03 shunting goods round ready for a 25 to come and take it away, that's actually all the locos I have and want to have at this time, all BR Blue. like a built up area behind it, very industrial, maybe think areas of manchester where industry would be right up against the tracks, one would have a wagon loaded and then be moved about.
Please let me know of ideas and ways to improve it, I am literally not great at designing plans, I may have overdone it with the amount in the space I have.
It would all be done with code 75 peco track.
Thanks in advance
as the topic says it will be 00 gauge and for shunting, but also allow for running stuff through, I am planning on having fiddle yards at both ends with a scenic section in the middle which is approximately 54 inches by 16 (maybe 17 cant stretch to 18 sadly) inches.
Here is a rough idea of what I am talking about
I am thinking that single car units like 128 and 121 can pass through, and maybe even get a coach or two shunted past just operational interest, other than that just an 03 shunting goods round ready for a 25 to come and take it away, that's actually all the locos I have and want to have at this time, all BR Blue. like a built up area behind it, very industrial, maybe think areas of manchester where industry would be right up against the tracks, one would have a wagon loaded and then be moved about.
Please let me know of ideas and ways to improve it, I am literally not great at designing plans, I may have overdone it with the amount in the space I have.
It would all be done with code 75 peco track.
Thanks in advance