Page 1 of 2
Cattle dock
Posted: Sun Jan 24, 2021 1:49 pm
by Davreb05
Hi everyone
I am trying to place a cattle dock on my layout
and would like to know if they could be accessed by
the cattle wagon first passing through a good shed.
Thanks David
Re: Cattle dock
Posted: Sun Jan 24, 2021 1:53 pm
by Walkingthedog
It wants to be where the cattle can be loaded then leave soon afterwards without being held up by other types of wagons.
Obviously with good road access as well.
Re: Cattle dock
Posted: Sun Jan 24, 2021 2:25 pm
by Davreb05
Hi
These are the 2 ideas I have at the moment.
The first picture shows cattle dock on front track with goods shed
behind, I would remove the front track after the rear of the catt!e wagon.
The second picture shows the cattle dock being accessed by
the cattle wagons being pushed through the goods shed.
Would appreciate any thoughts.
Thanks
David.
Re: Cattle dock
Posted: Sun Jan 24, 2021 2:31 pm
by Walkingthedog
On my old layout I did mine like this
Re: Cattle dock
Posted: Sun Jan 24, 2021 2:42 pm
by Davreb05
How much track did you have the other side
of the goods shed, would there need to be a lot, or
just room for a couple of wagons.
Re: Cattle dock
Posted: Sun Jan 24, 2021 2:45 pm
by Walkingthedog
The siding by the cattle dock took 5 wagons, the one through the shed about 8 and the same for the one on the other side of the shed.
Re: Cattle dock
Posted: Sun Jan 24, 2021 2:58 pm
by Davreb05
How much track did you have the other side
of the goods shed, would there need to be a lot, or
just room for a couple of wagon to pass through the
goods shed, like in the picture below.
Re: Cattle dock
Posted: Sun Jan 24, 2021 4:19 pm
by Walkingthedog
Enough for 1 1/2 wagons to pass through. Had to compromise due to space.
The cattle wagons didn’t go into the shed.
Re: Cattle dock
Posted: Sun Jan 24, 2021 8:49 pm
by Davreb05
Thank you for your information, it has been
really useful.
David.
Re: Cattle dock
Posted: Mon Jan 25, 2021 11:48 am
by cheshire lines
I found this track plan of Hale on the former Cheshire Lines Committee line from Manchester to Chester. The cattle dock area is separate from the goods shed.
https://www.igg.org.uk/gansg/00-app-5/haleyard.jpg
I'm not an expert, but I would have thought that having to access a cattle dock via the goods shed would have been disruptive to the general operation of the goods shed.