Double Slip wiring and switches

Post Reply
Bria46
Posts: 4
Joined: Mon Oct 22, 2018 8:35 pm
Location: Basildon
Contact:

Double Slip wiring and switches

#1

Post by Bria46 »

I have an analogue end to end layout incorporating Peco code 100 track.
The layout is operated by a single Gaugemaster controller and has eight separate sections accessed through H & M SL4 switches.
The layout incorporates two insulfrog double slips (SL90).
I have experienced at times a short circuit and I assume this is because I did not fit insulated rail joiners on the double slips.
I am now fitting insulated joiners and treating the double slips as separate sections.
When wiring up the double slips with feed and return to the outer rails, can the wiring still be fitted to H & M SL4 switches or do I have to use a different spec. of switch? The Peco instructions advise DPDT switch and I think the H & M SL4 are DPST
Any comments would be greatly appreciated.
User avatar
Stese
Posts: 369
Joined: Thu Oct 04, 2018 9:26 pm
Location: Wrexham, UK
Contact:

Re: Double Slip wiring and switches

#2

Post by Stese »

I think this page would be a good resource...

https://www.brian-lambert.co.uk/Electrical-Page-3.html

:)
Father, IT Guy, HO/OO Modeler.
User avatar
Brian
Posts: 2215
Joined: Thu Oct 04, 2018 3:49 pm
Location: SE Kent
Contact:

Re: Double Slip wiring and switches

#3

Post by Brian »

The Insulated frog Peco SL-90 DS when used with one controller doesn't need any alterations. It uses 8 metal rail joiners (Fishplates). No Nylon IRJs or switches are needed.

The only time IRJs and any switch(es) would be needed is if one of more of the tracks leading from the DS needs to be isolated, as the SL-90 does not provide direction set isolation like a standard point does.

This is clearly stated on the Peco SL-90 leaflet "Wiring for SL-90 Insulated Double Slip (Analogue control) One Controller" See extract of Peco leaflet attached below.


If you're experiencing short circuits on the one DC controller and when no train is travelling over the DS, then I suspect one or more rail feeds are the wrong way around on the rails abutting the DS. Suggest a careful check of all wiring to the rails is undertaken.
Peco SL-90.jpg
Image << Click the Icon to go to my website
Post Reply

Who is online

Users browsing this forum: Google [Bot] and 0 guests