Page 1 of 1
Layout
Posted: Tue Nov 15, 2022 9:11 am
by RogerB
Here is the layout I have in mind. Gentle critique always welcome. The track is built in SCARM using the Tilling TT-M library so possibly not completely accurate. I will await the Hornby TT:120 library to be uploaded to SCARM and do it again. All on a 7' x 3' board with R4 and R3 track on the left and R2 inside all that on the right. Not sure what happened on the right with the R2 track and the distance between the neighbours, but all will be resolved on the day. Room available regrettably prevents long sweeping curves. Top left rectangle is the signal box, top right the goods shed and the station is at the bottom. Rule 1 applies. R-
Re: Layout
Posted: Tue Nov 15, 2022 9:37 am
by Walkingthedog
On the right I think the R3 track is too close to the R4 not the R2 is too far from the R3.
I think the layout looks fine.
Re: Layout
Posted: Tue Nov 15, 2022 9:44 am
by RogerB
Yup,, that is why I said,
Not sure what happened on the right with the R2 track and the distance between the neighbours, but all will be resolved on the day.
No matter what I did one or the other was always "out" a tad.
R-
Re: Layout
Posted: Tue Nov 15, 2022 9:56 am
by Walkingthedog
So you did, I misread it.
I reckon the layout is good, you can get to and from the different circuits from any direction.
Re: Layout
Posted: Tue Nov 15, 2022 11:54 am
by yelrow
lot of points Rog, how do you intend to operate them.
Re: Layout
Posted: Tue Nov 15, 2022 12:04 pm
by Steve M
It will be interesting to see it all come together Roger. Shame the board can’t be a bit longer but appreciate your space constraints.
Re: Layout
Posted: Tue Nov 15, 2022 12:13 pm
by RogerB
yelrow wrote: ↑Tue Nov 15, 2022 11:54 am
lot of points Rog, how do you intend to operate them.
They'll be servo operated John. R-
Re: Layout
Posted: Tue Nov 15, 2022 6:23 pm
by Jsa274
Fifteen sets of points, nearly eclipses my layout’s sixteen motors - I’m sure others on here will have more than that!
Layout plan looks great with plenty of operational possibilities, the stubby siding off the inner loop platform opens up opportunities for traction swaps en route.
Re: Layout
Posted: Tue Nov 15, 2022 6:37 pm
by Walkingthedog
I had over 30 on my OO layout.
Re: Layout
Posted: Tue Nov 15, 2022 6:41 pm
by RogerB
Yes, I have packed them in a bit. Luckily, like most point motor controllers, it is possible to operate two servos fron one port. R-