Proses track spacing gauge
- RSR Engineer
- Posts: 256
- Joined: Sun Oct 07, 2018 11:18 pm
- Location: Freistaat Bayern
- Contact:
Proses track spacing gauge
Just a few comments on this little gadget. I found the Proses gauge very useful for laying concentric curves (track is Peco Streamline code 100). One thing though, the gauge does not sit snugly on the rail heads but has almost 1mm free play. To compensate for this, you need take up the sideplay in the same direction on both tracks.
Cheers,
Artur
Cheers,
Artur
- Walkingthedog
- Posts: 4978
- Joined: Thu Oct 04, 2018 5:51 pm
- Location: HAZLEMERE, BUCKS.
- Contact:
Re: Proses track spacing gauge
I too use those Peco track spacing gauges, I have three and they are great for setting Streamline (and Setrack too) to the correct spacings.
The gauge also has a platform height measure as well.
BTW. The centre line of Peco Streamline track on parallel lines is 50mm while Setrack/Hornby is 67mm.
The gauge also has a platform height measure as well.
BTW. The centre line of Peco Streamline track on parallel lines is 50mm while Setrack/Hornby is 67mm.
- teedoubleudee
- Posts: 1116
- Joined: Fri Oct 05, 2018 2:53 pm
- Location: Downham Market
- Contact:
Re: Proses track spacing gauge
Plus one for the Peco gauge.
Most people are shocked when they find out how bad I am as an electrician
-
- Posts: 1537
- Joined: Fri Oct 05, 2018 12:57 pm
- Contact:
Re: Proses track spacing gauge
What is the track spacing for the Western Region (E.g. Wales, and the south west of the country) as it used to be broad gauge so the spacing known as the 6ft is much wider, especially noticeable with the track near platforms where even 67mm spacing seems to be a little narrow.
I have mentioned this before as if I spaced using the 50mm gauges, they would not at all look prototypical for my location. While I no longer need one, I was wondering if such a track gauge was made? As most if the old Great Western Railway system was layed like this and the GWR seems to be the most popular at one time to be modelled, and then the B.R. Western Region which also would have been made to this track spacing over much of its route.
I have mentioned this before as if I spaced using the 50mm gauges, they would not at all look prototypical for my location. While I no longer need one, I was wondering if such a track gauge was made? As most if the old Great Western Railway system was layed like this and the GWR seems to be the most popular at one time to be modelled, and then the B.R. Western Region which also would have been made to this track spacing over much of its route.
Budget modelling in 0-16.5...
Re: Proses track spacing gauge
50mm nor 67mm is not the correct spacing for representation of "Standard" uk track spacing. They are compromises to allow over scale rolling stock to pass each other. In fact 45mm in OO is about correct but its generally far too narrow.
As for GWR, well heaven knows, its only the Brunel part that's on a wider track bed in some places.
The terminology for the spacing between lines is the "six foot" for standard twin tracked lines or "ten foot" where four lines run parallel with the ten foot being the middle space between four lines.
So on two line railways the outer edge is the Cess, then the four foot (Running line 1), then six foot then four foot (running line 2) and then the other Cess. Four lines would be... Cess-Four foot-six foot-four foot-ten foot-four foot-six foot-four four-Cess.
As for GWR, well heaven knows, its only the Brunel part that's on a wider track bed in some places.
The terminology for the spacing between lines is the "six foot" for standard twin tracked lines or "ten foot" where four lines run parallel with the ten foot being the middle space between four lines.
So on two line railways the outer edge is the Cess, then the four foot (Running line 1), then six foot then four foot (running line 2) and then the other Cess. Four lines would be... Cess-Four foot-six foot-four foot-ten foot-four foot-six foot-four four-Cess.
- bulleidboy
- Posts: 2317
- Joined: Thu Oct 04, 2018 6:30 pm
- Location: Basingstoke, Hants
- Contact:
-
- Posts: 125
- Joined: Sat Jan 19, 2019 9:23 pm
- Contact:
Re: Proses track spacing gauge
Me Cheapskate
I used some 2mm card to make any number of gauges in an H shape. The" 1 1" legs of the H are width between the rails of each track (16mm) and the bar part is sufficient to hold the sides at whatever with you want . I have a set of 50mm. 58mm and 67mm to ensure clearance on curves
Downside is that they are not instantly adjustable.
Rgds
I used some 2mm card to make any number of gauges in an H shape. The" 1 1" legs of the H are width between the rails of each track (16mm) and the bar part is sufficient to hold the sides at whatever with you want . I have a set of 50mm. 58mm and 67mm to ensure clearance on curves
Downside is that they are not instantly adjustable.
Rgds
-
- Posts: 1537
- Joined: Fri Oct 05, 2018 12:57 pm
- Contact:
Re: Proses track spacing gauge
Only just noticed your reply.Brian wrote: ↑Sun Dec 06, 2020 5:26 pm 50mm nor 67mm is not the correct spacing for representation of "Standard" uk track spacing. They are compromises to allow over scale rolling stock to pass each other. In fact 45mm in OO is about correct but its generally far too narrow.
As for GWR, well heaven knows, its only the Brunel part that's on a wider track bed in some places.
The terminology for the spacing between lines is the "six foot" for standard twin tracked lines or "ten foot" where four lines run parallel with the ten foot being the middle space between four lines.
So on two line railways the outer edge is the Cess, then the four foot (Running line 1), then six foot then four foot (running line 2) and then the other Cess. Four lines would be... Cess-Four foot-six foot-four foot-ten foot-four foot-six foot-four four-Cess.
Yes. I was taught these terms when I worked on the railways. I would say that sectional track spacing looks perfect for the railway line spacing in these parts.
https://youtu.be/wHi5HOqigPI
Here is an example of a typical ex. broad gauge main line station in Wales. Two trains can pass and one could pretty much ride a bicycle inbetween them (In theory).
Of course some areas the "6 foot" gap has narrowed over the years to be closer to todays spacing (In places) due to many years of track adjustments, but at stations and station throat areas there is quite a noticeable gap.
Last edited by Mountain Goat on Tue Dec 15, 2020 11:07 pm, edited 2 times in total.
Budget modelling in 0-16.5...
Who is online
Users browsing this forum: No registered users and 1 guest