The two simulations (EEP video 4, TrainController video 5) showed us that this layout can have an interesting train traffic flow. This gave us the confidence to now start sawing the wooden plates for the table.
The challenge was to transfer the drawing from the PC to the boards to have the lines to saw along. We did this by first placing a grid of boards over the layout drawing. This enabled us to read out the x,y coordinates of strategic points per board. Two points are needed for a straight line, three for a curve. We used a bendable plastic strip to draw smooth curved lines on the board.
This is the link to video Twinwoods & Bedford - 06 - Sawing the Tbale
