Layout taking shape.
Pretty much doing this as my first layout project. Have spent a good while ensuring that the track is well engineered, level, loads of test running etc. Didn't quite get the foam trackbed 100% on the curves but as going to ballast track that won't be a problem. Had a few derailments on the peco points with a small selection of my older Hornby stuff. Some quick googling revealed a change of wheelsets resolves and it did.
Just getting the buildings temporarily in place so as I can start adding grass, gravel, roads and eventually track ballast.
As I still won't have a permanent home for my layout for the immediate future, is there any way I can make the handful of buildings detachable when moving the layout? Maybe a section of 3mm ply that can hold a few buildings. Velcro to temporarily stick to baseboard? Once I have a permanent home, probably next year when we sort a new shed out, I'll want to increase detail and have everything permanently attached.
For now just want to get my trains running so I can appreciate them with a moderately detailed layout.