Baseboard access and removal

All posts regarding baseboard construction
wecpcs
Posts: 22
Joined: Sat Feb 16, 2019 6:59 pm
Location: Leysdown On Sea, Kent
Contact:

Re: Baseboard access and removal

#11

Post by wecpcs »

When I started mine I built the framework first and on top of that I fitted all the baseboard sections all jointed together with bolts and dowels. After the track was laid I laid on the lower shelf I fitted, to do all the wiring and soldering, but I did go through a number of tee shirts when doing the soldering upside down as well as having a bad back.
Post Reply

Who is online

Users browsing this forum: No registered users and 16 guests