The new layout
-
- Posts: 758
- Joined: Fri Oct 19, 2018 8:32 am
- Location: Norham, Northumberland
- Contact:
The new layout
Have at last made start on the New Layout. Here are some pictures of the slow progress. Had bit of setback after Christmas because hurt my shoulder and it was very painful so had break from making anything.
Have got most of the base units in place now and levelled. Now have to alter the old baseboards to fit. One problem is having to accommodate all the Railway stock while building the Baseboards. Have to move everything all the time. Never mind will get there in the end.
Have got most of the base units in place now and levelled. Now have to alter the old baseboards to fit. One problem is having to accommodate all the Railway stock while building the Baseboards. Have to move everything all the time. Never mind will get there in the end.
If only there was enough hours in the day..................John
Re: The new layout
Very impressive work. It looks great.
And the Lord said unto John “Come forth and receive eternal life”, but John came fifth and won a toaster!
-
- Posts: 758
- Joined: Fri Oct 19, 2018 8:32 am
- Location: Norham, Northumberland
- Contact:
Re: The new layout
I only have small room which give me 6ft 2" one end and 6ft4"the other wide, and 9ft 4" long .
As the boards have been used before I have I went over them with filler and sanded over the surface then gave it coat of old brown emulsion had laying around. They look nice and smooth again. There are doors for the cupboards to tidy it up.
As the boards have been used before I have I went over them with filler and sanded over the surface then gave it coat of old brown emulsion had laying around. They look nice and smooth again. There are doors for the cupboards to tidy it up.
If only there was enough hours in the day..................John
-
- Posts: 758
- Joined: Fri Oct 19, 2018 8:32 am
- Location: Norham, Northumberland
- Contact:
Re: The new layout
Not impressive me I am not much of a carpenter.
If only there was enough hours in the day..................John
-
- Posts: 114
- Joined: Fri Oct 05, 2018 11:47 am
- Location: Coldstream, Scottish Borders
- Contact:
Re: The new layout
Looks good to me John and you have the satisfaction of having done it yourself
Ted
Re: The new layout
Keep worrying that Heather might want to start playing Table Tennis again. As my layout now occupies the table, i would be in Dickies Meadow. I simply added my baseboard on top, with no permission to drill any holes in table
-
- Posts: 758
- Joined: Fri Oct 19, 2018 8:32 am
- Location: Norham, Northumberland
- Contact:
Re: The new layout
Last night I was putting the doors on the cupboards and one of them when unpacked was damaged. As I bought them back in December 5th Using home delivery from B&Q I though they would say I should have checked them when I received them or with in a set time, but no, they are sending out another door by van to exchange it............. Well I Must say, that is very good service. One up for B&Q , well done...........John
If only there was enough hours in the day..................John
- Walkingthedog
- Posts: 4972
- Joined: Thu Oct 04, 2018 5:51 pm
- Location: HAZLEMERE, BUCKS.
- Contact:
Re: The new layout
Nice to hear. Had a similar thing with Wickes a couple of years ago. Had two palettes of slabs delivered. Months later I found one palette was a slab short. Rang them and they delivered a single slab. I could have fetched one locally but they wouldn’t let me.
Nurse, the screens!
Re: The new layout
good customer services. Perhaps they wanted to see if you had laid them properly. I found wickes, excellent when i was in uk. B and Q , french owned. Part of Castorama, group now, i am led to belive.
-
- Posts: 758
- Joined: Fri Oct 19, 2018 8:32 am
- Location: Norham, Northumberland
- Contact:
Re: The new layout
Laid what properly John..............
If only there was enough hours in the day..................John
Who is online
Users browsing this forum: No registered users and 1 guest