High Power CDU (Capacitor Discharge Unit).

Post Reply
2027Joe
Posts: 31
Joined: Fri Oct 11, 2019 9:33 am
Contact:

High Power CDU (Capacitor Discharge Unit).

#1

Post by 2027Joe »

HI All

I am in the process of building my new layout and will be using point motors for the very first time.

I am using some Peco PL11 point motors and a few Rails of Sheffield point motors.

In all I will have approximately 26 point motors.

My question is, "Do I need to have a CDU for every single point motor, or can I connect 4 or 5 or more to one CDU ?"

I have looked around the internet but cannot seem to find a definitive answer !

Hopefully someone here will be able to point me in the right direction. (No pun intended :lol: )

Many thanks in advance

Joe H
User avatar
Steve M
Posts: 3461
Joined: Thu Oct 04, 2018 5:29 pm
Location: Rochester, Kent
Contact:

Re: High Power CDU (Capacitor Discharge Unit).

#2

Post by Steve M »

You only need one for the whole layout. You will only throw one or two points at a time so the CDU will recharge quick enough for any subsequent motors.
"Not very stable, but incredibly versatile." ;)
brian1951
Posts: 1273
Joined: Thu Oct 04, 2018 5:52 pm
Contact:

Re: High Power CDU (Capacitor Discharge Unit).

#3

Post by brian1951 »

As Steve said, scroll down to point motor wiring https://www.brian-lambert.co.uk/Electrical_Page_2.html
2027Joe
Posts: 31
Joined: Fri Oct 11, 2019 9:33 am
Contact:

Re: High Power CDU (Capacitor Discharge Unit).

#4

Post by 2027Joe »

Thank you all so much.

Steve for the information and Brian for the diagrams.

Now I can get on with the job.

Thanks again

Joe H :D
User avatar
RAF96
Posts: 527
Joined: Fri Oct 05, 2018 6:33 am
Location: Dereham, Norfolk, UK
Contact:

Re: High Power CDU (Capacitor Discharge Unit).

#5

Post by RAF96 »

I have used two CDUs but only because my layout has two main boards on opposite sides of the room and it was more practical for local wiring to have one either side than a single CDU feeding all points.
Tricky Dicky
Posts: 387
Joined: Fri Oct 05, 2018 6:49 pm
Contact:

Re: High Power CDU (Capacitor Discharge Unit).

#6

Post by Tricky Dicky »

For sequential point changes as already advised a single CDU will be enough but if you plan on having route setting when maybe several points change at once then an additional CDU is advisable.

Richard
Post Reply

Who is online

Users browsing this forum: No registered users and 0 guests