Happy to keep RogerB company !
Happy to keep RogerB company !
Hi all and RogerB !
Just thought it looked like RogerB was a little lonely in here so I thought I would pop in
My TT120 layout is underway, taking a while as I am a newbie to model railways and finding, despite some forward planning, that I am waiting on tools to help out newbs and having some teething issues to start.
I started in Mid January-ish and still am not much further than having the track down and points powered, but despite my usual impatience, I have decided this will take as long as it takes
Just thought it looked like RogerB was a little lonely in here so I thought I would pop in
My TT120 layout is underway, taking a while as I am a newbie to model railways and finding, despite some forward planning, that I am waiting on tools to help out newbs and having some teething issues to start.
I started in Mid January-ish and still am not much further than having the track down and points powered, but despite my usual impatience, I have decided this will take as long as it takes
Re: Happy to keep RogerB company !
Well done TT. My build has come to a stop partly due to illness following Covid [hopefully nearly sorted] and an impending house move. R-
Young at heart. Slightly older in other parts.
Re: Happy to keep RogerB company !
Get well soon, and hope the move goes OK, still room for a layout I hope ?
Re: Happy to keep RogerB company !
Its been a while, and I still have more to do when I can find some time, but My "Millwood" layout is well underway.
It is set in late era 3, and with a swap of rolling stock early era 4.
The pics do make the colours look more lurid than they actually are !
Base layout:
Basic scenery and ballasting done:
The lift off section (where the tunnels run under) the stuff on here is all N scale to give a bit of forced perspective:
And several with all the buildings in place, still plenty to do:
As a beginner to all this this time last year, I know its not in the league of a lot on here, but I am pleased with how its going.
Oh ... and yes the Class 08 is out of Era, with the lack of small shunters in TT120, I bought 2, one to re-livery into a representation of the early J45/DES1 that were in period, and another to be done as era4 for when I run the early BR sessions.
Here are my repaints:
The J45/DES1 representation, less grimy as it would have been a lot newer !
It is set in late era 3, and with a swap of rolling stock early era 4.
The pics do make the colours look more lurid than they actually are !
Base layout:
Basic scenery and ballasting done:
The lift off section (where the tunnels run under) the stuff on here is all N scale to give a bit of forced perspective:
And several with all the buildings in place, still plenty to do:
As a beginner to all this this time last year, I know its not in the league of a lot on here, but I am pleased with how its going.
Oh ... and yes the Class 08 is out of Era, with the lack of small shunters in TT120, I bought 2, one to re-livery into a representation of the early J45/DES1 that were in period, and another to be done as era4 for when I run the early BR sessions.
Here are my repaints:
The J45/DES1 representation, less grimy as it would have been a lot newer !
Last edited by Too Tall on Sat Jan 27, 2024 9:53 pm, edited 1 time in total.
Re: Happy to keep RogerB company !
Very nice TT. Coming along very well indeed. R-
Young at heart. Slightly older in other parts.
- Walkingthedog
- Posts: 4948
- Joined: Thu Oct 04, 2018 5:51 pm
- Location: HAZLEMERE, BUCKS.
- Contact:
Re: Happy to keep RogerB company !
If you’re a beginner I can’t imagine what your layout will look like when you get the hang of it. Excellent.
Nurse, the screens!
- bulleidboy
- Posts: 2294
- Joined: Thu Oct 04, 2018 6:30 pm
- Location: Basingstoke, Hants
- Contact:
Re: Happy to keep RogerB company !
Well done - that is very good indeed - something to be proud of. No need to rush, just add little bits here and there.
Who is online
Users browsing this forum: No registered users and 2 guests